Senim-d project. Integrated detailed design for deep conversion refinery (dcr) reliability and fail-safety enhancement project

  • Debottlenecking of DCR facilities: Vacuum Gas Oil Hydrotreatment units — С-100 (B100K VGO), FCC and Fractionation units —С-200 (B200K FCC, MC), Absorption and Gas Fractionation units — С-300 (B300K GC), as per UOP FEED requirements.
  • DCR С-100, С-200, С-300 units’ design capacity and target product output achieved.
  • Processing of heavy coker gas oil made possible contributing to higher target product output from DCR and improved conversion at the POCR as a whole.