Detailed Design for Delayed Coker Revamp Project

  • Engineering calculations for Reactor Unit P-1, P-2, P-3, and P-4 provided due to:
  • Replacement / reinforcement of steel structure;
  • Replacement of reactors, incl. arrangement of central inlet, hydraulic opening system for bottom hatch, installation of nuclear level gauges;
  • Replacement of grab cranes;
  • Replacement of by-product pumps;
  • Installation of K-1 Tower bottoms filter unit.